A new racer 8

   

  

 .Two coats of high build primer are applied to the bottom before turning the boat right side up.

 

   

 Rolling the boat over in straps.

Once upright the side frames are beveled and the planks lined off in preparation for the battens .

The cross spals are left in place until the deck carlings are installed .

 

   

  Back Next
A new racer 1 A new racer 2 A new racer 3 A new racer 4 A new racer 5 A new racer 6 A new racer7 A new racer 8 A new racer 9 A new racer 10 A new racer 11 A new racer 12 A new racer 13 A new racer 14 A new racer 15 A new racer 16 A new racer 17 A new racer 18
Designs

Home 30 foot Hackercraft Jacks Ditchburn Allouette The family Seabird Lindsay Dispro Crusoe 1937 Ditchburn A New Runnabout Waterford dispro A new Racer Gentlemans Racer Old Poke The Witch Hawkstone A New Dispro Lady Patricia 1 New Link Bar https://www.facebook.com/pages/Windsor-Boat-works-limited/185510771500093

 

 
Send mail to windsor@muskoka.com with questions or comments about this web site.
Copyright 2003 Windsor Boat works limited
Last modified: 04/10/05